Wazzup Pilipinas!
The Department of Transportation and Communications (DOTC) has awarded another improvement project for the Metro Rail Transit Line 3 (MRT-3) system to minimize operational disruptions by ensuring better track upkeep.
The joint venture of Kempal Construction & Supply Corp. and TPE Share Sales Inc. bagged the P160-Million contract to supply a brand-new rail grinding machine which will remove track irregularities and extend track life.
The machine, along with operations and maintenance manuals, repair tools, and a five (5)-year supply of spares, will be delivered within 360 calendar days from issuance of the Notice to Proceed.
This will put an end to the classification of systematic rail grinding as special repair works – which entails additional costs – and instead characterize it as an ordinary preventive maintenance undertaking. With its own rail grinding machine, the MRT-3 management can minimize costs, as similar equipment will no longer be leased from other firms.