Wazzup Pilipinas!
Most of the Metro Rail Transit Line 3 (MRT-3) glitches experienced by riders the past months are set to be eliminated soon, as the Department of Transportation and Communications (DOTC) has awarded the signaling system upgrade project to Bombardier Transportation Signal, Ltd. as part of the agency’s railway rehabilitation efforts.
“This upgrade of an obsolete signaling system, which should have been done by the private sector owner years ago, is crucial in minimizing operational disruptions. This will improve reliability and efficiency of the rail system for the benefit of our passengers,” said DOTC Secretary Jun Abaya.
Under the P53.37-million contract, Bombardier will replace the existing local control system called MAN 900 with the more contemporary EBI Screen 900 – a software with the same functionality as MAN 900, but which will allow the use of modern personal computers and fiber optic technology – over the next seven (7) months.
The signaling system maintains safe distances between trains and controls their speed: issues with its components may result in less operating trains and in slower travel.
Apart from modernizing the software components, this upgrade will also ensure the availability of spare parts needed for the uninterrupted and efficient operation of the metropolis’ busiest rail line.