BREAKING

Friday, May 17, 2013

7 Groups Qualify To Bid For The Mactan-Cebu International Airport Project – DOTC





Wazzup Pilipinas!

All seven (7) groups vying for the first airport project to be bid out under President Benigno S. Aquino III’s Public-Private Partnership (PPP) program have been successfully prequalified, the Department of Transportation and Communications (DOTC) disclosed on Thursday (May 16, 2013).

The announcement, which was made four (4) days ahead of schedule, signifies that the P 17.5-Billion Mactan-Cebu International Airport (MCIA) Passenger Terminal Building Project will be contested by the following groups:

  • AAA Airport Partners, led by the Ayala and Aboitiz groups and Houston airport operator ADC&HAS;
  • Filinvest-CAI Consortium of the Gotianuns and Singapore’s Changi Airport;
  • First Philippine Airports of the Lopez group and New Zealand’s Infratil Asia Limited airport operator;
  • GMR Infrastructure and Megawide Consortium, which includes India’s Delhi Airport’s operator;
  • MPIC-JGS Airport Consortium, composed of the Pangilinan and Gokongwei companies, as well as France’s Aeroports de Lyon;
  • SM-led Premier Airport Group, which includes Switzerland’s Zurich Airport operators; and
  • San Miguel-Incheon Airport Consortium, led by the SMC conglomerate and the operator of South Korea’s Incheon Airport.

“This is a good number for ensuring optimal competition during the bid itself,” said the agency’s spokesperson, Atty. Migs Sagcal.

Under the updated timeline for the bidding process, the qualified consortia will now have until August 28, 2013 to submit their bid proposals.

“We are keen to find out which group will make the most advantageous offer to government. As we have said before, the more cooperation we have from the bidders, the sooner the public will enjoy the benefits of our projects,” Sagcal added.

The MCIA Project will modernize the country’s second-largest aviation hub and the gateway to the Visayas with the construction of a new world-class international passenger terminal building having an 8-million annual passenger capacity. It will also renovate the existing terminal building, which has been operating at over-capacity with 6.7 million passengers going through the 4.5-million passenger capacity structure in 2012.

About ""

WazzupPilipinas.com is the fastest growing and most awarded blog and social media community that has transcended beyond online media. It has successfully collaborated with all forms of media namely print, radio and television making it the most diverse multimedia organization. The numerous collaborations with hundreds of brands and organizations as online media partner and brand ambassador makes WazzupPilipinas.com a truly successful advocate of everything about the Philippines, and even more since its support extends further to even international organizations including startups and SMEs that have made our country their second home.

1 comment:

  1. Thanks for sharing.I found a lot of interesting information here. A really good post, very thankful and hopeful that you will write many more posts like this one.
    https:/akinator
    kodi.software
    anydesk.vip

    ReplyDelete

Ang Pambansang Blog ng Pilipinas Wazzup Pilipinas and the Umalohokans. Ang Pambansang Blog ng Pilipinas celebrating 10th year of online presence
 
Copyright © 2013 Wazzup Pilipinas News and Events
Design by FBTemplates | BTT